Scheduling a Replacement Date

As per Seleting Single, Multiple & Group/Wear Packs , choose Single Select, Multi Select or Group (or Wear Pack). Choose the Scheduled Shut if required and Scheduled Change Out date. Select the Tick to save. Tap the OK button on the Successfully Scheduled change out pop-up. This will now appear on the Scheduled Change Out field within the Summary section when you select a liner or screen.

 

Liners_Scheduling_1.jpg

prev next
Was this article helpful?
0 out of 0 found this helpful

Articles in this section

prev next

Related sections