Scheduling an asset is a process of setting the Scheduled Changeout value against an asset. This can be used for planning purposes.
Navigate to the relevant area, locate and select the asset to schedule. Click on the Row Menu icon on the record row. Click on Schedule to schedule the selected asset for replacement.
Set the Scheduled Shut, set the Scheduled Change Out dates, then click Save to set the values against the asset.