Below is a brief explanation of what is included in the various Complex Liner Reports. All report tables are grouped by part number.
Liner Details Report – Displays a list of all liner information installed on a chute.
Liner Summary Report – Displays a list of all liner information installed on a chute, without the layout.
Liner Planning Report – Displays a list of liners which have been scheduled for replacement or have wear tests which has a calculated change out date in the search period which have yet to be scheduled.
Liner Planning Report (A3) – Displays a list of liners which have been scheduled for replacement or have wear tests which has a calculated change out date in the search period which yet to be scheduled. Suitable for printing on A3 sheets.
Liner Replacements Report – Displays a list of Liners Replaced during the selected Period.
Liner Wear Report – Displays a heat map on the layout with remaining thickness. Table displays the Calculated Change Out (CCO) date for each liner to a configured alarm point.
Liner Wear Report - Tonnes – Displays a heat map on the layout with remaining thickness. Table displays the Calculated Change Out (CCO) date for each liner to a configured alarm point. Based on tonnage figures rather than by time between tests.
Skirt Liner Replacements Report – Displays a list of liners replaced, rotated or adjusted during the search period.
Skirt Liner Summary Report – Displays a list of liners scheduled for replacement, scheduled for rotation & scheduled for adjustment.